GA‑ASI breaks ground on 85,000‑sq.‑ft. El Mirage hangar to boost MQ‑9B SkyGuardian production
General Atomics Aeronautical Systems held a groundbreaking on January 14, 2026, for a new nearly 85,000‑sq.‑ft. hangar at El Mirage Airfield to expand MQ‑9B SkyGuardian/SeaGuardian assembly, testing and Certifiable Ground Control Station support from allied customers.
Key takeaways
- Groundbreaking: Ceremony held January 14, 2026, launching an ~85,000‑sq.‑ft. hangar adjacent to GA‑ASI’s Desert Horizon Flight Operations Facility (GA‑ASI press release).
- Mission: Facility will house, assemble and test MQ‑9B SkyGuardian®/SeaGuardian® systems and support up to a dozen Certifiable Ground Control Stations (CGCS).
- Site features: Project adds three launch pads and four gate terminals; larger Desert Horizons II filing outlines an expanded complex on ~312 acres (CEQAnet project file).
- Contractor and leadership: Parkway Construction leads building; GA‑ASI CEO Linden Blue and local officials attended the ceremony.
Construction and the new facility
GA‑ASI is expanding its high‑desert footprint roughly 15 miles east of Victorville. The new, nearly 85,000‑square‑foot hangar will sit adjacent to the company’s Desert Horizon Flight Operations Facility and add dedicated assembly and test space for the MQ‑9B SkyGuardian®/SeaGuardian® platforms. The company says the hangar will include space for Certifiable Ground Control Stations — with room for as many as a dozen CGCS units — and will add three aircraft launch pads and four gate terminals to support flight operations (UAS Weekly).
Why GA‑ASI says it needs more space
GA‑ASI CEO Linden Blue told attendees the company is “filling our order book for new MQ‑9Bs,” and needs additional room to build and test the latest remotely piloted aircraft. Breaking ground on the hangar, he said, ensures GA‑ASI has “the right team and facilities in place to build and test these important aircraft,” positioning the firm to meet rising global demand (MRO Business Today).
Orders and international demand
The MQ‑9B family has attracted orders from allied nations such as the United Kingdom, Canada and Germany, the latter having announced SeaGuardian purchases. GA‑ASI highlights the broader Predator/MQ line’s millions of flight hours and markets the MQ‑9B as a long‑endurance, multi‑mission platform for surveillance and strike roles (AviTrader).
Regulatory filings and the Desert Horizons II plan
Public records show a separate, larger CEQA filing — Desert Horizons II (PROJ‑2025‑00050) — that seeks a Conditional Use Permit and Major Variance to consolidate parcels and build a much larger complex. The Desert Horizons II proposal outlines a 118,020‑sq.‑ft. hangar, a 19,512‑sq.‑ft. ground control building, a 20,000‑sq.‑ft. stockroom and other facilities on roughly 312 acres, signaling GA‑ASI’s longer‑term growth plans and additional review for environmental and community impacts (CEQAnet project file).
Who’s building the hangar
Parkway Construction is contracted to build the immediate 85,000‑sq.‑ft. hangar within GA‑ASI’s existing operations area. Parkway CEO Ryan Elmer spoke at the groundbreaking alongside San Bernardino County Supervisor Jesse Armendarez and GA‑ASI leadership (MRO Business Today).
Local reaction and questions raised
Local officials joined GA‑ASI at the ceremony; San Bernardino County Supervisor Jesse Armendarez highlighted regional economic benefits. At the same time, residents and community groups commonly raise questions about:
- Job creation: How many local, permanent jobs vs. contractor roles will result — construction, skilled manufacturing, technical or largely temporary positions?
- Environmental and infrastructure impacts: Effects on traffic, water resources and air quality in an arid region already under environmental stress.
- Public review: CEQA filings and public hearings tied to Desert Horizons II will address many of these concerns (CEQAnet).
About GA‑ASI and the MQ‑9B
General Atomics Aeronautical Systems is a leading developer of unmanned aircraft systems, including the Predator family, MQ‑9A Reaper®, MQ‑1C Gray Eagle® and the newer MQ‑9B SkyGuardian®/SeaGuardian® platforms. The company cites more than 9 million flight hours across its product line and positions the MQ‑9B as a long‑endurance, multi‑mission system central to its El Mirage expansion (GA‑ASI press release).
Implications for Los Angeles, California
The El Mirage expansion carries economic, political and social implications for the wider Los Angeles region:
Economic impact
Short‑term construction work and potential longer‑term roles in manufacturing, systems testing and operations could benefit local suppliers and service firms in the Los Angeles area. However, the scale of permanent hires versus contractor roles remains unclear, leaving uncertainty about direct job gains for LA County residents (MRO Business Today).
Political consequences
Regional leaders have signaled support; for Los Angeles policymakers this underscores Southern California’s role as an aerospace and defense hub and may increase pressure to balance job growth with environmental and community concerns (UAS Weekly).
Social effects
Local vocational programs and community colleges could partner with GA‑ASI for workforce training, opening pathways to advanced manufacturing careers; details on formal training commitments are not yet disclosed (GA‑ASI press release).
Cultural relevance
The expansion reinforces Southern California’s long ties to aerospace while prompting debate about the region’s role in producing military and remotely piloted systems. Public sentiment often weighs economic benefits against ethical and environmental concerns (AviTrader).
Practical effects on daily life
Residents may see increased construction and supply traffic on desert highways near Victorville, and testing operations could alter local airspace use. The Desert Horizons II CEQA filing indicates upcoming environmental review that could address water use, emissions and noise and require mitigation measures (CEQAnet).
Sources and further reading
- GA‑ASI press release
- UAS Weekly coverage
- MRO Business Today coverage
- AviTrader report
- CEQAnet project file (Desert Horizons II, PROJ‑2025‑00050)
Reporting note: This article preserves facts and source URLs from GA‑ASI statements and public filings listed above.
